i've done this recently after seeing someone on here did it. can't find the thread but basically i put tioga beatrap 2 cups in the old frame got a unsealed 1 1/8th headset, took the bearings out of the cages, loads of grease in the cups, bearings in then used the rest of the 1/18th headset to finish off.
will look for the thread.