Nottingham track has had a MAJOR facelift (last berm moved 30m,first and second berms tarmacced and new layouts for straights 3 & 4)
The redisign was done by Kelvin Batey and was built with a lot of help from his dad jim
On April 5th we have the grand reopening race and it would be nice to see as many Radsters as possible there, we can even run an old school class if enough of you want to race
more details and track pics as the event draws closer
DINGO