Contractors came back to finish the job on weds, cue the heavens to open
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild62.jpg)
This the the 3rd straight, the brumy contractor fella drove the dumper over the quad, keith went ape shit
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild63.jpg)
Attempting to whack anything seems equally pointless
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild64.jpg)
Here's the proof I do actually do work when I go up there
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild65.jpg)
Trying to sort the profile out on the tripple
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild66.jpg)
Re profiled step up looks class now
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild67.jpg)
After messing the surface up he decided to dig the burm up
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild68.jpg)
Tis starting to look well yellow from the bottom now
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild69.jpg)
Sub going onto the 3rd burm
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild70.jpg)
Surface going onto the 4th straight
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild71.jpg)
Conditions on course were good to firm....
![](http://www.usmbcworld.co.uk/summerhill/pics/shillrebuild72.jpg)
The re-profiled tripple, am well proud of the shape this is now
So thats about it
I will put this in as simple terms as I can, if it doesnt stop raining then the track will not get whacked. Its too wet to do anything with at the moment. We need one dry day to get the roller over it all and let it settle, am hopefull this day will come but if it doesnt stop raining I really dunno what will happen. This place seems to go from bad to worse to worse than worse
One dejected and soaking Eddy